In brief
Module C2 is a conformity assessment procedure under Annex VII of Regulation (EU) 2016/425: conformity to type based on internal production control plus supervised product checks at random intervals. A notified body checks samples from series production at least once a year. For category III PPE, Module C2 is one of the two prescribed options.
At a glance
- Legal basis
- Art. 19 and Annex VII of Regulation (EU) 2016/425
- Prerequisite
- EU type-examination (Module B)
- Content
- internal production control + supervised product checks
- Checking body
- notified body chosen by the manufacturer
- Frequency
- at least once a year, at random intervals (Annex VII, point 4.2)
- Mandatory for
- Category III (alternative to Module D)
- Category II
- Module B and Module C are prescribed (Art. 19)
- Stated in the declaration
- procedure and supervising body (Annex IX)
Detailed definition
Regulation (EU) 2016/425 provides several modules for the conformity assessment of personal protective equipment. Module C2 is described in Annex VII. It requires a passed EU type-examination (Module B) and then ensures that ongoing series production corresponds to the examined type.
The procedure has two parts:
- Internal production control: the manufacturer takes all measures necessary so that manufactured products conform to the approved type and the requirements of the Regulation.
- Supervised product checks: a notified body chosen by the manufacturer checks products from production at random intervals. Annex VII, point 4.2 specifies that these checks take place at least once a year; the body determines the timing. It takes a sample and checks whether production is homogeneous and the products conform to the type-examination certificate.
Under Art. 19 of the Regulation:
- PPE category III: Module B plus either Module C2 or Module D (quality assurance of the production process with annual audits). One of the two is mandatory.
- Category II: Module B plus Module C. Under Module C the manufacturer controls production itself, without samples checked by a notified body.
Module C2 and Module C share internal production control. The difference lies in the samples that an independent body regularly takes and checks under C2.
When Module C2 is applied, the EU declaration of conformity names the procedure and the supervising notified body under Annex IX. For category III PPE, the CE marking is also followed by that body's identification number (Art. 17(3)).
In practice at Nitzsche
Most of our 2025 declarations of conformity with OETI in Vienna (identification number 0534) explicitly name Module C2 “under the supervision of the notified body” OETI in addition to the EU type-examination. This applies among others to:
- hardshell jackets, softshell jackets, summer vests and Comfort Stretch trousers of the Titania line (declarations of 14 and 17 February 2025),
- hardshell jacket, softshell jacket, protective vest and Comfort Stretch trousers BRK RD Bayern (declarations of 1 December 2025),
- protective jacket and softshell jacket RD SH and the protective jacket Bonn (declarations of 20 September and 28 October 2025).
All of these products are declared as PPE category II. For them, the declarations therefore name product checks supervised by an independent body in addition to the manufacturer's production control. The older declarations with the Saxon Textile Research Institute name only the type-examination. All declarations are available on the declarations of conformity page.
Frequently asked questions
What is the difference between Module C and Module C2?
Under Module C the manufacturer controls series production alone. Under Module C2 a notified body is added, which takes and checks products from production at random intervals, at least once a year. Both require a passed EU type-examination.
What is the difference between Module C2 and Module D?
Module C2 checks finished products by sampling. Module D instead assesses the quality system for production, final inspection and testing, which the notified body audits at least once a year. For category III PPE the manufacturer can choose between the two procedures.
Does Module C2 in a declaration mean the product is category III?
No. The category depends on the risk under Annex I, and the declaration normally states the category explicitly. All our products with Module C2 are declared as category II. Here the declaration names the procedure under which series production is to be supervised.
Sources (4)
This article gives a general overview. It does not replace the text of the standard or the risk assessment in your organisation. For any product, its declaration of conformity and the manufacturer's information are binding. If you notice a mistake, please let us know.